Front façade before start of construction in context with the neighboring houses showing the unfortunate 1970’s era re-build with its tiny windows and factory style yellow brick.
Rear façade before start of construction showing deteriorated condition of the building. Also, the orange ‘X’, at the lower left, is the surveyor’s mark indicating the Base Flood Elevation (BFE). Clearly, the lowest floor level is below the BFE.